Sengkang Connection (Sengkang West)
Building Layout

Site Plan & Ramp-Up Vehicular Circulation

Designed for seamless 20/40-foot container loading, wide turning radius & direct unit access.

Sengkang Connection site location plan

Key Site Plan Highlights

  • Covered Loading Bays & Container Access: Dedicated loading/unloading bays equipped with dock levellers for container lorries.
  • 8-Storey Ramp-up Building Structure: Wide vehicular driveways and ramp-up access allowing smooth traffic flow across upper storeys.
  • Green Mark Platinum SLE: Energy-efficient facade and maintainability features for long-term operational cost reduction.
Direct Developer Launch Updates

Request Official Site Plan PDF

Register to receive high-resolution site plan diagrams & floor layout plans when released.